https://www.marinetechnologynews.com/news/johan-sverdrup-drilling-platform-561239
Johan Sverdrup Drilling Platform Installed
The 22,000-tonne topside for the drilling platform was lifted into position in one single lift on the Johan Sverdrup field last weekend.