MarineLink Share

Link

Separate multiple addresses with commas(,).
Captcha
https://www.marinelink.com/news/navfac-begins-installation-process-of-wind-turbine325927

NAVFAC Begins Installation Process of Wind Turbine

By Lee H. Installation of the Marine Corps' first large scale wind turbine at Marine Corps Logistics Base (MCLB) Barstow began Jan.