MarineLink Share

Link

Separate multiple addresses with commas(,).
Captcha
https://www.marinelink.com/news/largest-turret-module375119.aspx

First ‘round 3’ Wind Turbine Installed at Westermost Rough

The UK’s first commercial 6 megawatt (MW) wind turbine has been installed at the Westermost Rough wind farm, in a new landmark for renewable energy.