MarineLink Share

Link

Separate multiple addresses with commas(,).
Captcha
https://www.marinelink.com/news/kongsberg-completes-refit-of-navigation-bridge312306

Kongsberg Completes Refit of Navigation Bridge

Kongsberg Maritime Simulation concluded a $1 million refit of the largest simulated navigation bridge in the world at the end of 2006.