MarineLink Share

Link

Separate multiple addresses with commas(,).
Captcha
https://www.marinelink.com/news/installed-topsides373766.aspx

Valemon Topsides Installed

On Monday, July 28, the topsides were lifted into place on the steel jacket on the Valemon field in the North Sea. Produced by Samsung…