https://www.worldenergynews.com/news/first-round-wind-turbine-installed-westermost-rough-610577
First ‘round 3’ Wind Turbine Installed at Westermost Rough
The UK’s first commercial 6 megawatt (MW) wind turbine has been installed at the Westermost Rough wind farm, in a new landmark for renewable energy.