http://www.marinelink.com/news/westermost-installed375119.aspx
First ‘round 3’ Wind Turbine Installed at Westermost Rough
The UK’s first commercial 6 megawatt (MW) wind turbine has been installed at the Westermost Rough wind farm, in a new landmark for renewable energy.